{"id":7952,"date":"2026-07-30T15:06:41","date_gmt":"2026-07-30T07:06:41","guid":{"rendered":"https:\/\/www.kelaiii.com\/?p=7952"},"modified":"2026-07-30T15:10:41","modified_gmt":"2026-07-30T07:10:41","slug":"precast-concrete-wall-panel-house-construction","status":"publish","type":"post","link":"https:\/\/www.kelaiii.com\/de\/precast-concrete-wall-panel-house-construction\/","title":{"rendered":"So bauen Sie ein Haus mit Betonfertigteilw\u00e4nden"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_86 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Inhalts\u00fcbersicht<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Inhaltsverzeichnis umschalten\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Umschalten auf<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-1'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.kelaiii.com\/de\/precast-concrete-wall-panel-house-construction\/#Precast_Concrete_Wall_Panel_Floor_Slab_House_Construction_A_Complete_Process_Guide\" >Hausbau mit Betonfertigteilw\u00e4nden und -decken: Ein umfassender Leitfaden zum gesamten Bauprozess<\/a><ul class='ez-toc-list-level-2' ><li class='ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.kelaiii.com\/de\/precast-concrete-wall-panel-house-construction\/#Abstract\" >Zusammenfassung<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.kelaiii.com\/de\/precast-concrete-wall-panel-house-construction\/#1_Introduction_Why_Precast_Concrete_Construction_Is_Growing\" >1. Einleitung: Warum der Fertigteilbau an Bedeutung gewinnt<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.kelaiii.com\/de\/precast-concrete-wall-panel-house-construction\/#2_Overall_Construction_Workflow\" >2. Allgemeiner Ablauf der Bauarbeiten<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.kelaiii.com\/de\/precast-concrete-wall-panel-house-construction\/#3_Site_Leveling_Excavation_and_3_7_Lime-Soil_Compaction\" >3. Gel\u00e4ndegl\u00e4ttung, Aushub und Verdichtung einer Kalk-Erde-Mischung im Verh\u00e4ltnis 3:7<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.kelaiii.com\/de\/precast-concrete-wall-panel-house-construction\/#4_Column_Footing_and_Foundation_Beam_Construction\" >4. Bau von S\u00e4ulenfundamenten und Fundamenttr\u00e4gern<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.kelaiii.com\/de\/precast-concrete-wall-panel-house-construction\/#5_Cast-in-Place_Concrete_Frame_Columns_and_Beams\" >5. Vor Ort gegossene Betonrahmenst\u00fctzen und -tr\u00e4ger<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.kelaiii.com\/de\/precast-concrete-wall-panel-house-construction\/#6_Precast_Concrete_Wall_Panel_and_Floor_Slab_Installation\" >6. Einbau von Betonfertigteilw\u00e4nden und -deckenplatten<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.kelaiii.com\/de\/precast-concrete-wall-panel-house-construction\/#7_Key_Quality_Control_Points\" >7. Wichtige Punkte der Qualit\u00e4tskontrolle<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.kelaiii.com\/de\/precast-concrete-wall-panel-house-construction\/#8_Applicable_Standards_and_Codes_to_Reference\" >8. Anwendbare Normen und Vorschriften, auf die Bezug genommen wird<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.kelaiii.com\/de\/precast-concrete-wall-panel-house-construction\/#9_Benefits_of_Using_a_Precast_Concrete_Wall_Panel_Extruder_and_Panel_Making_Machine\" >9. Vorteile des Einsatzes eines Extruders f\u00fcr Betonfertigteil-Wandplatten und einer Plattenfertigungsmaschine<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/www.kelaiii.com\/de\/precast-concrete-wall-panel-house-construction\/#10_Frequently_Asked_Questions\" >10. H\u00e4ufig gestellte Fragen<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/www.kelaiii.com\/de\/precast-concrete-wall-panel-house-construction\/#11_Conclusion\" >11. Schlussfolgerung<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h1><span class=\"ez-toc-section\" id=\"Precast_Concrete_Wall_Panel_Floor_Slab_House_Construction_A_Complete_Process_Guide\"><\/span><strong><b>Hausbau mit Betonfertigteilw\u00e4nden und -decken: Ein umfassender Leitfaden zum gesamten Bauprozess<\/b><\/strong><span class=\"ez-toc-section-end\"><\/span><\/h1>\n<h2><span class=\"ez-toc-section\" id=\"Abstract\"><\/span><strong><b>Zusammenfassung<\/b><\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Betonfertigteil-Wandplatten und -Deckenplatten sind die Kernkomponenten von <strong><b>Fertigteilhaus aus Beton<\/b><\/strong>, die die Vorteile einer industrialisierten Fertigung, einer schnellen Montage vor Ort, Energieeffizienz und hoher struktureller Stabilit\u00e4t bieten. Im Vergleich zu herk\u00f6mmlichen, vollst\u00e4ndig vor Ort gegossenen Geb\u00e4uden reduzieren H\u00e4user aus Betonfertigteilen den Nassbau vor Ort erheblich, verk\u00fcrzen die Bauzeit, verringern den Bauschutt und gew\u00e4hrleisten standardisierte, normkonforme Bauteile. Dieser Leitfaden f\u00fchrt durch einen vollst\u00e4ndigen, in der Praxis erprobten Bauablauf \u2013 Gel\u00e4ndegl\u00e4ttung und Fundamentvorbereitung, Errichtung der Fundamentkonstruktion, Ortbeton-Rahmenst\u00fctzen und -tr\u00e4ger sowie Einbau von vorgefertigten Wandplatten und Deckenplatten \u2013 und erl\u00e4utert, wie ein <a href=\"https:\/\/www.kelaiii.com\/de\/extruder-fur-betonfertigteil-wandplatten\/\"><span style=\"color: #ff0000;\"><strong><b>Extruder f\u00fcr Betonfertigteil-Wandplatten<\/b><\/strong><\/span><\/a>\u00a0und eine <span style=\"color: #0000ff;\"><a style=\"color: #0000ff;\" href=\"https:\/\/www.kelaiii.com\/de\/maschine-zur-herstellung-von-betonfertigteilzaunen\/\"><strong><b>Maschine zur Herstellung von Betonfertigteilplatten<\/b><\/strong><\/a><\/span>\u00a0werden in jeder Bauphase eingesetzt. Au\u00dferdem werden die technischen Kontrollpunkte und Qualit\u00e4tsstandards beschrieben, die f\u00fcr die Errichtung eines sicheren, vorschriftsm\u00e4\u00dfigen Niedrigbauhauses aus Betonfertigteilen erforderlich sind.<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"1_Introduction_Why_Precast_Concrete_Construction_Is_Growing\"><\/span><strong><b>1. Einleitung: Warum der Fertigteilbau an Bedeutung gewinnt<\/b><\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Da sich die Industrialisierung des Bauwesens weltweit beschleunigt, entwickelt sich die vorgefertigte (montierte) Bauweise zu einem zentralen Ansatz f\u00fcr den \u00f6kologischen und CO\u2082-armen Wandel der Branche. <strong><b>Betonfertigteil-Wandplatten und -Deckenplatten<\/b><\/strong>\u00a0werden unter standardisierten Werksbedingungen hergestellt, bis zur endg\u00fcltigen Festigkeit ausgeh\u00e4rtet und anschlie\u00dfend zur Montage auf die Baustelle transportiert \u2013 in Kombination mit vor Ort gegossenen Rahmenelementen sorgt dieser hybride Ansatz f\u00fcr ein ausgewogenes Verh\u00e4ltnis zwischen struktureller Integrit\u00e4t, Stabilit\u00e4t und Baugeschwindigkeit. Er findet breite Anwendung bei selbstgebauten H\u00e4usern in l\u00e4ndlichen Gebieten, niedrigen B\u00fcrogeb\u00e4uden und kleinen Nebengeb\u00e4uden.<\/p>\n<p>Die traditionelle Vollortbetonbauweise ist mit hohem Arbeitsaufwand vor Ort, langen Bauzeiten, Wetterabh\u00e4ngigkeit und uneinheitlicher Qualit\u00e4tskontrolle verbunden. Die Montage von Betonfertigteilen \u2013 bei der die Bauteile vorgefertigt und die Module vor Ort zusammengebaut werden, kombiniert mit einem Ortbetonfundament und -rahmen \u2013 gleicht die begrenzte Gesamtsteifigkeit rein vorgefertigter Konstruktionen wirksam aus. Dieser Leitfaden folgt Schritt f\u00fcr Schritt dem nat\u00fcrlichen Bauablauf, von der Fundamentvorbereitung bis zum Einbau der Betonfertigteile, und erl\u00e4utert die Logik sowie die wichtigsten Kontrollpunkte jeder Bauphase, um sowohl die Bauqualit\u00e4t als auch die Tragwerkssicherheit zu gew\u00e4hrleisten.<\/p>\n<p>Anmerkung zum Geltungsbereich: Der folgende Arbeitsablauf wurde verfasst f\u00fcr <strong><b>Niedrige (in der Regel 1\u20133-st\u00f6ckige) Wohn- und kleinere Gesch\u00e4ftsgeb\u00e4ude<\/b><\/strong>. Bei mehrgeschossigen Fertigteilkonstruktionen werden der Rahmen und die Fertigteile in der Regel Etage f\u00fcr Etage in einer fortlaufenden Abfolge montiert, anstatt den gesamten Rahmen fertigzustellen, bevor die Platten eingebaut werden; Leser, die an mehrgeschossigen Projekten arbeiten, sollten die Abfolge entsprechend anpassen und die \u00f6rtlichen Normen f\u00fcr Fertigteilkonstruktionen befolgen (siehe die Verweise auf die Bauvorschriften in Abschnitt 8).<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"2_Overall_Construction_Workflow\"><\/span><strong><b>2. Allgemeiner Ablauf der Bauarbeiten<\/b><\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Diese Bauweise kombiniert eine <strong><b>Ortbetonfundament, Ortbeton-Rahmens\u00e4ulen und -tr\u00e4ger sowie Montage von Fertigbauteilen<\/b><\/strong>. Ausgehend vom tragtechnischen Verhalten und den Bauvorschriften lautet die Reihenfolge der Kernschritte wie folgt:<\/p>\n<ol>\n<li>Gel\u00e4ndeausgleich, Fundamentaushub und schichtweise Verdichtung von Kalk-Erde im Verh\u00e4ltnis 3:7<\/li>\n<li>Bau von Pfahlfundamenten und Fundamentbalken<\/li>\n<li>Rahmenkonstruktion aus Ortbeton mit St\u00fctzen und Tr\u00e4gern<\/li>\n<li>Einbau von Betonfertigteil-Wandelementen und -Deckenplatten<\/li>\n<\/ol>\n<p>Jede Bauphase ist eng mit der n\u00e4chsten verkn\u00fcpft: Die vorhergehende Bauphase muss die Abnahme bestehen, bevor die n\u00e4chste Bauphase beginnen kann. Dadurch werden eine stabile Grundlage, ein gerader Rahmen, die pr\u00e4zise Montage der Bauteile sowie die allgemeine Sicherheit und Langlebigkeit des Bauwerks gew\u00e4hrleistet.<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"3_Site_Leveling_Excavation_and_3_7_Lime-Soil_Compaction\"><\/span><strong><b>3. Gel\u00e4ndegl\u00e4ttung, Aushub und Verdichtung einer Kalk-Erde-Mischung im Verh\u00e4ltnis 3:7<\/b><\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Das Fundament bildet die tragende Basis des Hauses. Die Qualit\u00e4t der Baustellenvorbereitung und der Verdichtung der Kalk-Erd-Mischung bestimmt unmittelbar die Gesamtstabilit\u00e4t und tr\u00e4gt dazu bei, sp\u00e4tere Setzungen, Risse und Schr\u00e4glagen zu verhindern \u2013 damit ist dies die erste entscheidende Bauphase. Sie umfasst drei Teile: die Nivellierung des Baugel\u00e4ndes, den Aushub der Baugrube und die schichtweise Verdichtung der Kalk-Erd-Mischung.<\/p>\n<h3><strong><b>3.1 Gel\u00e4ndegl\u00e4ttung<\/b><\/strong><\/h3>\n<p>Legen Sie vor Baubeginn mithilfe einer Totalstation und einer Wasserwaage die H\u00f6hen- und Achsenkontrolllinien auf der Grundlage der Bauzeichnungen und der Gel\u00e4ndetopografie fest und definieren Sie dabei die Geb\u00e4udegrenze, den Aushubbereich und die Arbeitszonen. Entfernen Sie Vegetation, Schlamm, Bauschutt und weichen Oberboden, damit die Arbeitsfl\u00e4che sauber und fest ist. Verwenden Sie einen Bagger mit manueller Feinarbeit, um das Gel\u00e4nde auf die geplante Neigung zu planieren. Stellen Sie dabei einen reibungslosen Wasserabfluss sicher und verhindern Sie, dass sich Regenwasser ansammelt und den Baugrund durchn\u00e4sst. F\u00fchren Sie nach der Planierung eine vorl\u00e4ufige Verdichtung durch, um die Gesamtdichte des Gel\u00e4ndes zu verbessern und eine ebene Arbeitsfl\u00e4che f\u00fcr Aushub- und Kalk-Boden-Arbeiten vorzubereiten.<\/p>\n<h3><strong><b>3.2 Aushub der Baugrube<\/b><\/strong><\/h3>\n<p>Legen Sie die Aushubtiefe und -breite anhand der Fundamentplanung und der \u00f6rtlichen geologischen Gegebenheiten fest und befolgen Sie dabei das Prinzip \u201cschichtweiser Aushub, kein \u00dcberaushub\u201d. F\u00fchren Sie den Gro\u00dfteil der Arbeiten mit mechanischen Aushubverfahren durch und wechseln Sie erst in den letzten 20\u201330 cm \u00fcber der geplanten Sohlenh\u00f6he zum manuellen Aushub, um den ungest\u00f6rten Untergrund nicht zu beeintr\u00e4chtigen und dessen Tragf\u00e4higkeit nicht zu verringern. \u00dcberpr\u00fcfen Sie w\u00e4hrend der Aushubarbeiten kontinuierlich die Achsenlinien, die H\u00f6he und die Neigung der Baugrube und entfernen Sie unverz\u00fcglich losen Boden und stehendes Wasser. Nach Abschluss der Aushubarbeiten ist die untere Bodenschicht zu untersuchen; sollten weicher Boden oder Hohlr\u00e4ume festgestellt werden, sind diese zu melden und durch Bodenaustausch oder Verdichtung zu behandeln, um die Tragf\u00e4higkeit auf das in der Planung geforderte Niveau zu bringen.<\/p>\n<h3><strong><b>3.3 Verdichtung einer 3:7-Kalk-Boden-Schicht<\/b><\/strong><\/h3>\n<p>Sobald die Baugrube die Pr\u00fcfung bestanden hat, f\u00fcllen Sie eine Kalk-Erd-Mischung im Verh\u00e4ltnis 3:7 ein (ein Volumenverh\u00e4ltnis von 3:7 zwischen Kalkhydrat und normaler Erde) \u2013 ein g\u00e4ngiges Material zur Fundamentverst\u00e4rkung, das wegen seiner hohen Festigkeit, geringen Verdichtbarkeit und guten Stabilit\u00e4t gesch\u00e4tzt wird. Sieben Sie den Boden zuvor, um Steine und Fremdk\u00f6rper zu entfernen, und halten Sie den Feuchtigkeitsgehalt im optimalen Bereich, damit die Kalk-Erde-Mischung eine gleichm\u00e4\u00dfige Farbe aufweist und weder Streifen noch Klumpen bildet.<\/p>\n<p>Den Kalkboden schichtweise auftragen und verdichten, wobei jede lose Schicht eine Dicke von 20\u201330 cm aufweisen sollte und mit einem Froschstampfer oder einer Walze in mindestens drei Durchg\u00e4ngen verdichtet wird. Wenden Sie eine gleichm\u00e4\u00dfige Verdichtungskraft an und pr\u00fcfen Sie den Verdichtungsgrad nach jeder Schicht; <strong><b>Die Verdichtung muss \u226595% der maximalen Trockendichte erreichen<\/b><\/strong>\u00a0(\u00dcberpr\u00fcfung mittels Ring-Cutter-Verfahren, Sandersatzverfahren oder nuklearem Dichtemessger\u00e4t gem\u00e4\u00df der geltenden lokalen Pr\u00fcfnorm) vor dem Einbau der n\u00e4chsten Schicht. Sobald die Kalk-Erd-Schicht die vorgesehene Untergrundh\u00f6he erreicht hat, ist die Oberfl\u00e4che zu nivellieren und auszuh\u00e4rten \u2013 w\u00e4hrend der Aush\u00e4rtung darf kein Fahrzeugverkehr stattfinden und es d\u00fcrfen keine Lasten aufgeschichtet werden \u2013, damit die Kalk-Erd-Schicht stetig an Festigkeit gewinnt und eine tragf\u00e4hige Unterlage f\u00fcr die nachfolgende Fundamentkonstruktion bildet.<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"4_Column_Footing_and_Foundation_Beam_Construction\"><\/span><strong><b>4. Bau von S\u00e4ulenfundamenten und Fundamenttr\u00e4gern<\/b><\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Sobald die Kalk-Erd-Grundschicht ordnungsgem\u00e4\u00df ausgeh\u00e4rtet ist, beginnt der Bau der Fundamentkonstruktion. S\u00e4ulenfundamente und Fundamenttr\u00e4ger verbinden den Boden mit der dar\u00fcberliegenden Rahmenkonstruktion \u2013 sie nehmen die Lasten des Geb\u00e4udes auf, leiten sie gleichm\u00e4\u00dfig in den Boden weiter und verhindern Verformungen des Fundaments, w\u00e4hrend sie gleichzeitig die allgemeine strukturelle Integrit\u00e4t st\u00e4rken. Dies ist die entscheidende \u00dcbergangsphase zwischen Fundament und \u00dcberbau.<\/p>\n<h3><strong><b>4.1 Layout und Vorbereitung des Untergrunds<\/b><\/strong><\/h3>\n<p>Legen Sie anhand der Achsenkontrollpunkte des Geb\u00e4udes die Lage-, Kanten- und H\u00f6henkontrolllinien f\u00fcr S\u00e4ulenfundamente und Fundamenttr\u00e4ger pr\u00e4zise fest und kennzeichnen Sie diese deutlich mit Tintenstrichen. Reinigen und ebnen Sie die Oberfl\u00e4che des Kalk-Erd-Untergrunds, entfernen Sie losen Staub und Schmutz und befeuchten Sie die Oberfl\u00e4che, damit der Beton fest mit dem Untergrund haftet und sich keine Hohlr\u00e4ume oder Risse bilden.<\/p>\n<h3><strong><b>4.2 Einbau der Bewehrung und Schalung<\/b><\/strong><\/h3>\n<p>Die Bewehrung f\u00fcr Fundament und Fundamenttr\u00e4ger ist gem\u00e4\u00df den Konstruktionszeichnungen herzustellen, wobei Stabdurchmesser, Abstand und Verankerungsl\u00e4nge streng einzuhalten sind; die Staboberfl\u00e4chen m\u00fcssen rost- und \u00f6lfrei sein. Zuerst ist die Fundamentbewehrung einzubauen, wobei die Hauptst\u00e4be und B\u00fcgel so zu befestigen sind, dass der Bewehrungskorb exakt positioniert und fest verbunden ist; anschlie\u00dfend ist die Fundamentbalkenbewehrung einzubauen, wobei auf durchgehende St\u00e4be, normgerechte \u00dcberlappungsl\u00e4ngen und eine geordnete Anordnung der St\u00e4be an den Verbindungsknoten ohne \u00dcberf\u00fcllung oder Fehlausrichtung zu achten ist. Nach dem Verbinden sind Abstandhalter f\u00fcr die Betondeckung anzubringen, um eine gleichm\u00e4\u00dfige Dicke der Schutzschicht zu gew\u00e4hrleisten.<\/p>\n<p>Nach der \u00dcberpr\u00fcfung der Bewehrung ist die Schalung \u2013 aus Stahl oder hochfesten Holzplatten \u2013 mit dichten Fugen und ohne L\u00fccken oder Verformungen anzubringen; sie ist mit Stahlrohren und Holz zu verstreben, um der Schalung ausreichende Steifigkeit und Stabilit\u00e4t zu verleihen und ein Ausbeulen oder das Austreten von M\u00f6rtel w\u00e4hrend des Betonierens zu verhindern. \u00dcberpr\u00fcfen Sie nach der Montage der Schalung erneut die Abmessungen, die H\u00f6he und die Lage des Fundaments anhand der Konstruktionsunterlagen.<\/p>\n<h3><strong><b>4.3 Betonieren und Aush\u00e4rten<\/b><\/strong><\/h3>\n<p>Pour with ready-mix or on-site batched concrete at the design strength grade. Pour and vibrate in layers using an immersion vibrator to remove air voids and ensure density, avoiding honeycombing, pitting, or voids. Pour column footings and foundation beams continuously in one operation where practical, minimizing construction joints to protect structural integrity.<\/p>\n<p>After pouring, trowel and level the surface promptly; once the concrete reaches initial set, begin water curing for no fewer than 7 days (adjust per ambient temperature and the applicable curing standard), keeping the surface moist and undisturbed throughout, so foundation concrete strength develops steadily as a base for the frame construction above.<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"5_Cast-in-Place_Concrete_Frame_Columns_and_Beams\"><\/span><strong><b>5. Vor Ort gegossene Betonrahmenst\u00fctzen und -tr\u00e4ger<\/b><\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Once the foundation structure reaches at least 70% of its design (28-day) strength \u2014 verified using same-condition-cured test cubes\/cylinders, with the exact age depending on concrete grade and ambient temperature \u2014 construction of the upper cast-in-place frame columns and beams begins. The frame is the load-bearing skeleton of the upper structure: it carries the loads transferred from the wall panels and floor slabs, anchors the precast components, and strengthens overall stiffness and seismic performance. A cast-in-place frame effectively compensates for the reduced continuity at precast component joints, improving overall structural safety.<\/p>\n<h3><strong><b>5.1 Vertical Layout and Base Preparation<\/b><\/strong><\/h3>\n<p>On the foundation top surface, precisely set out the axis and location dimensions for frame columns and beams, and mark control lines. Roughen the concrete contact surface on the foundation top, removing laitance and loose concrete, then clean and dampen it to strengthen the bond between new and old concrete and prevent delamination cracking.<\/p>\n<h3><strong><b>5.2 Frame Column and Beam Reinforcement<\/b><\/strong><\/h3>\n<p>Per the drawings, lap and tie the vertical column reinforcement, controlling verticality and spacing; stirrup spacing in encrypted and non-encrypted zones, as well as lap and anchorage lengths, must strictly meet the design&#8217;s seismic requirements. After column reinforcement passes inspection, erect beam support scaffolding and beam-bottom formwork, then tie beam reinforcement, ensuring reinforcement at beam\u2013column joints is properly arranged and firmly connected, forming a complete load-bearing cage.<\/p>\n<h3><strong><b>5.3 Formwork Installation and Bracing<\/b><\/strong><\/h3>\n<p>After reinforcement passes inspection, install side formwork for columns and beams. Formwork must be flush, tightly joined, and sealed against grout leakage. Brace column formwork with clamps and steel pipe supports to control verticality; support beam formwork with a system of uprights, horizontal members, and jacks, with strictly controlled support spacing so the system can safely carry the concrete&#8217;s self-weight and construction loads without deformation or settlement. After installation, fully check formwork dimensions, elevation, verticality, and stability.<\/p>\n<h3><strong><b>5.4 Concrete Pouring, Vibration, and Curing<\/b><\/strong><\/h3>\n<p>Pour frame column and beam concrete in layers: pour and vibrate columns first, then, once the column concrete reaches the beam-soffit elevation, pause briefly before pouring the beams, ensuring dense bonding at beam\u2013column joints. During vibration, avoid contact with reinforcement and formwork to prevent bar displacement or formwork deformation. After pouring, trowel and level promptly and mark component elevations.<\/p>\n<p>Begin water curing as soon as the concrete reaches final set; cover with geotextile for moisture retention in hot weather, and apply insulation protection in cold weather, with a curing period of no fewer than 7 days. Formwork and shoring may only be removed once the frame concrete reaches the design strength required for handling precast component loads \u2014 after which precast component installation begins.<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"6_Precast_Concrete_Wall_Panel_and_Floor_Slab_Installation\"><\/span><strong><b>6. Einbau von Betonfertigteilw\u00e4nden und -deckenplatten<\/b><\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Once the cast-in-place frame is complete and inspected, the core operation begins: installing the precast concrete wall panels and floor slabs. The wall panels and floor slabs used in this workflow are batch-produced on dedicated industrial equipment \u2014 a <strong><b>Extruder f\u00fcr Betonfertigteil-Wandplatten<\/b><\/strong>\u00a0und eine <strong><b>Maschine zur Herstellung von Betonfertigteilplatten<\/b><\/strong>\u00a0\u2014 which replace the traditional labor-intensive approach of manual formwork and site-cast precasting. This significantly improves component production accuracy and speed while controlling material waste and labor cost, laying the foundation for a faster, lower-cost build.<\/p>\n<p>Structural logic note: in this workflow, the <strong><b>cast-in-place frame columns and beams are the primary load-bearing skeleton<\/b><\/strong>\u00a0\u2014 they are built first and carry the building&#8217;s gravity and lateral loads. The precast wall panels are <strong><b>non-load-bearing infill\/enclosure elements<\/b><\/strong>\u00a0installed into the completed frame afterward, while the precast floor slabs are structural components that bear directly on the frame beams. This division of roles is exactly what makes the <strong><b>Extruder f\u00fcr Betonfertigteil-Wandplatten<\/b><\/strong>\u00a0the right tool for the job: continuous-extrusion forming is best suited to hollow-core, lightweight wall panels that do not need large-diameter structural reinforcement or heavy embedded connection hardware, which is precisely the case for infill panels sitting inside an already load-bearing frame. Their connections to the frame only need to resist self-weight and out-of-plane wind\/seismic loads plus construction handling \u2014 not the seismic sleeve\/grout-lap connections required for structural load-bearing precast shear walls (see Section 8 for standards covering that separate use case, relevant only if a project substitutes load-bearing precast walls for the cast-in-place frame).<\/p>\n<p>All precast components are formed on the equipment in one integrated process, steam-cured, and strength-tested before being transported to the site for lifting and assembly, giving them precise dimensions, stable strength, and high consistency. Installation strictly follows the sequence &#8220;wall panels before floor slabs, interior walls before exterior walls,&#8221; ensuring components are installed in an orderly way with reasonable load paths and secure connections.<\/p>\n<figure id=\"attachment_7954\" aria-describedby=\"caption-attachment-7954\" style=\"width: 222px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.kelaiii.com\/de\/extruder-fur-betonfertigteil-wandplatten\/\"><img fetchpriority=\"high\" decoding=\"async\" class=\"wp-image-7954\" src=\"https:\/\/www.kelaiii.com\/wp-content\/uploads\/2026\/07\/Precast-Concrete-Wall-Panel-Production-Line-171x300.webp\" alt=\"Extruder f\u00fcr Betonfertigteil-Wandplatten\" width=\"222\" height=\"389\" title=\"\" srcset=\"https:\/\/www.kelaiii.com\/wp-content\/uploads\/2026\/07\/Precast-Concrete-Wall-Panel-Production-Line-171x300.webp 171w, https:\/\/www.kelaiii.com\/wp-content\/uploads\/2026\/07\/Precast-Concrete-Wall-Panel-Production-Line-7x12.webp 7w, https:\/\/www.kelaiii.com\/wp-content\/uploads\/2026\/07\/Precast-Concrete-Wall-Panel-Production-Line.webp 400w\" sizes=\"(max-width: 222px) 100vw, 222px\" \/><\/a><figcaption id=\"caption-attachment-7954\" class=\"wp-caption-text\">Extruder f\u00fcr Betonfertigteil-Wandplatten<\/figcaption><\/figure>\n<hr \/>\n<h3><strong><b>6.1 Pre-Installation Preparation<\/b><\/strong><\/h3>\n<p>Before components arrive on site, verify the quality of wall panels and floor slabs produced by the <strong><b>Extruder f\u00fcr Betonfertigteil-Wandplatten<\/b><\/strong>\u00a0und <strong><b>Maschine zur Herstellung von Betonfertigteilplatten<\/b><\/strong>, checking specifications, dimensions, strength, and surface finish. Both machines operate on mechanized, assembly-line production: the wall panel extruder can complete concrete distribution, extrusion forming, and vibration\/compaction in a single integrated pass, producing panels with even density and minimal dimensional deviation; the precast concrete panel making machine can be configured for custom floor slab thickness and reinforcement layout to match project requirements, with high batch-production efficiency. Compared with traditional precasting, this substantially cuts material waste and labor cost.<\/p>\n<p>On receipt, inspect panels and slabs for surface cracks, chipped edges, corners, or deformation, and verify that embedded parts and connection holes are correctly positioned. Stack components by type on a leveled, compacted storage area with timber dunnage \u2014 wall panels stored vertically, floor slabs stored horizontally \u2014 to prevent crushing or damage.<\/p>\n<p>At the same time, clean the site, re-verify elevations, and re-mark axis lines. Mark installation and elevation control lines for wall panels and floor slabs at the corresponding frame column\/beam positions, and set elevation shims to ensure an accurate installation datum. Inspect and calibrate the crane, lifting slings, and alignment tools in advance, and put safety protection measures in place.<\/p>\n<h3><strong><b>6.2 Precast Wall Panel Installation<\/b><\/strong><\/h3>\n<p>Wall panels are lifted using a multi-point crane rig. Lifting points are set based on the panel&#8217;s center of gravity to ensure even load distribution and prevent deformation or cracking during lifting. Once the panel is lifted above its installation position, lower it slowly while workers guide it into precise alignment, adjusting position, verticality, and levelness against the control lines.<\/p>\n<p>After initial placement, secure the panel with temporary bracing, evenly spaced, to keep it stable and prevent tipping. Promptly correct verticality and joint width so adjacent panels align with consistent, even gaps. Once corrected, connect the panel to the cast-in-place frame through its embedded connectors \u2014 welding or bolted anchorage is the standard, code-compliant approach here, since the panel is a non-load-bearing infill element restrained by an already-completed load-bearing frame, not a structural shear wall \u2014 to fix the panel&#8217;s final position.<\/p>\n<p>Once all wall panels are installed and secured, clean out the joints between panels and between panels and the frame, then seal them with specialized grout or fine-aggregate concrete, fully compacted, to protect the wall assembly&#8217;s integrity, air-tightness, and water resistance.<\/p>\n<h3><strong><b>6.3 Precast Floor Slab Installation<\/b><\/strong><\/h3>\n<p>Once the wall panels are installed, secured, and the connection joints have reached adequate strength, floor slab installation begins. Slabs are lifted using a balanced multi-point lifting frame, raised and lowered smoothly to avoid impact or swinging that could damage components or shift wall panels. Slabs are laid strictly per the layout drawings, bearing on the top of the frame beams or load-bearing wall panels with consistent, code-compliant bearing length.<\/p>\n<p>After placement, adjust slab spacing, elevation, and flatness so the floor surface is level with even joint widths. At slab-to-slab and slab-to-frame connections, anchor and weld the embedded reinforcement to connect the slab&#8217;s protruding bars to the frame beam and wall panel reinforcement, strengthening the floor&#8217;s integration with the overall structure. Fill joints with fine-aggregate concrete in layers, fully vibrated and compacted, then cure promptly to prevent joint cracking.<\/p>\n<h3><strong><b>6.4 Joint Treatment and Quality Acceptance<\/b><\/strong><\/h3>\n<p>Once all wall panels and floor slabs are installed, fully inspect component position, elevation, verticality, and flatness, and check the weld quality, anchorage length, and grouting density of every connection joint to confirm secure, reliable connections. Correct any installation deviations promptly, and complete a full structural self-inspection and re-inspection. Only after passing acceptance should roofing, interior finishing, and other follow-on work proceed.<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"7_Key_Quality_Control_Points\"><\/span><strong><b>7. Wichtige Punkte der Qualit\u00e4tskontrolle<\/b><\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ol start=\"5\">\n<li>Foundation stage: strictly control the 3:7 lime-soil mix ratio, layer thickness, and number of compaction passes; test compaction ratio throughout using a documented method (ring-cutter\/sand-replacement\/nuclear density) to eliminate soft base or under-compaction risk and prevent settlement at the source.<\/li>\n<li>Foundation and frame stage: strictly control rebar size, spacing, and anchorage length; secure formwork bracing; vibrate concrete thoroughly during pouring to prevent honeycombing, pitting, or voids; strictly follow curing procedures to ensure design strength is reached.<\/li>\n<li>Precast component installation stage: inspect components rigorously on arrival; follow standard lifting procedures to prevent damage; align components precisely, tightly control verticality and flatness deviation, and ensure joint connections and grouting are fully compacted and secure to protect overall structural stiffness and stability.<\/li>\n<li>Stage handover control: strictly enforce the principle that &#8220;the next stage does not begin until the previous stage passes inspection,&#8221; with documented concealed-work inspection records at every stage to maintain quality control throughout construction.<\/li>\n<\/ol>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"8_Applicable_Standards_and_Codes_to_Reference\"><\/span><strong><b>8. Anwendbare Normen und Vorschriften, auf die Bezug genommen wird<\/b><\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>For a technically defensible construction record, each stage above should be cross-checked against the relevant national or regional codes, for example (China-context references \u2014 substitute local equivalents where applicable):<\/p>\n<ul>\n<li>Code for Acceptance of Constructional Quality of Concrete Structures (GB 50204)<\/li>\n<li>Code for Design of Building Foundation (GB 50007)<\/li>\n<li>Code for Seismic Design of Buildings (GB 50011)<\/li>\n<li>Technical Specification for Precast Concrete Structures (JGJ 1) and Technical Standard for Assembled Buildings with Concrete Structure (GB\/T 51231) \u2014 primarily relevant if load-bearing precast wall panels are used in place of the cast-in-place frame; not required for the non-load-bearing infill panels described in Section 6<\/li>\n<li>Code for Construction of Building Foundation Treatment \/ Ground Treatment Specifications (JGJ 79)<\/li>\n<\/ul>\n<p>Projects outside China should apply the locally recognized equivalents (e.g., ACI 318 \/ PCI design and construction guidance in the U.S., or Eurocode 2 in the EU) for concrete design, curing, and precast connection requirements.<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"9_Benefits_of_Using_a_Precast_Concrete_Wall_Panel_Extruder_and_Panel_Making_Machine\"><\/span><strong><b>9. Vorteile des Einsatzes eines Extruders f\u00fcr Betonfertigteil-Wandplatten und einer Plattenfertigungsmaschine<\/b><\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul>\n<li>Faster production: continuous, mechanized forming replaces manual formwork, cutting panel and slab production time significantly.<\/li>\n<li>Higher dimensional accuracy: machine-controlled distribution, forming, and vibration reduce dimensional deviation compared with manual site-casting.<\/li>\n<li>Lower material waste and labor cost: precise batching and automated forming reduce concrete overage and manual labor hours.<\/li>\n<li>Consistent quality: steam curing and in-line strength testing give every panel and slab comparable strength and density.<\/li>\n<li>Faster, cleaner site assembly: factory-finished components reduce wet on-site work, shortening the overall build schedule and cutting construction waste.<\/li>\n<\/ul>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"10_Frequently_Asked_Questions\"><\/span><strong><b>10. H\u00e4ufig gestellte Fragen<\/b><\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><strong><b>Wozu dient eine Extrudiermaschine f\u00fcr Betonfertigteil-Wandplatten?<\/b><\/strong><\/h3>\n<p>A <span style=\"color: #0000ff;\"><a style=\"color: #0000ff;\" href=\"https:\/\/www.cnkelaiii.com\/precast-concrete-wall-panel-extruder-machine\/\" target=\"_blank\" rel=\"noopener\">Extruder f\u00fcr Betonfertigteil-Wandplatten<\/a><\/span> mechanizes wall panel production \u2014 distributing concrete, extruding it to shape, and vibrating\/compacting it in one continuous pass. It is ideal for producing hollow-core, lightweight wall panels that serve as non-load-bearing infill or enclosure walls inside an already load-bearing cast-in-place frame, which is exactly the role wall panels play in this construction sequence (frame built first, panels installed after).<\/p>\n<h3><strong><b>Wozu dient eine Maschine zur Herstellung von Betonfertigteilplatten?<\/b><\/strong><\/h3>\n<p>A <span style=\"color: #ff0000;\"><a style=\"color: #ff0000;\" href=\"https:\/\/www.cnkelaiii.com\/precast-concrete-wall-panel-making-machine\/\" target=\"_blank\" rel=\"noopener\">Maschine zur Herstellung von Betonfertigteilplatten<\/a><\/span> (often used for floor slabs) forms components to a specified thickness and reinforcement layout, enabling high-volume, consistent production of precast floor slabs for low-rise housing and light commercial buildings.<\/p>\n<h3><strong><b>Wie sieht der typische Bauablauf bei einem Fertighaus aus Beton aus?<\/b><\/strong><\/h3>\n<p>Gel\u00e4ndegleichstellung und Verdichtung des Kalkbodens, anschlie\u00dfend Errichtung der S\u00e4ulenfundamente und Fundamenttr\u00e4ger, dann Guss vor Ort der Rahmenst\u00fctzen und -tr\u00e4ger und schlie\u00dflich Einbau der vorgefertigten Wandplatten und Deckenplatten \u2013 jede Bauphase wird vor Beginn der n\u00e4chsten gepr\u00fcft.<\/p>\n<h3><strong><b>Eignet sich diese Methode f\u00fcr mehrst\u00f6ckige Geb\u00e4ude?<\/b><\/strong><\/h3>\n<p>Wie beschrieben, ist dieser Arbeitsablauf f\u00fcr Flachbauten vorgesehen. Bei mehrgeschossigen Fertigteilbauten werden der Rahmen und die Fertigteile in der Regel Etage f\u00fcr Etage errichtet, anstatt zun\u00e4chst den gesamten Rahmen fertigzustellen; dabei sollten die in Abschnitt 8 genannten Normen f\u00fcr montierte Bauwerke beachtet werden.<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"11_Conclusion\"><\/span><strong><b>11. Schlussfolgerung<\/b><\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The staged construction method described here \u2014 <strong><b>site and foundation treatment \u2192 foundation construction \u2192 cast-in-place frame construction \u2192 precast component installation<\/b><\/strong>\u00a0\u2014 matches the practical logic of building with precast concrete wall panels and floor slabs. Built on the industrialized production strength of a <strong><b>Extruder f\u00fcr Betonfertigteil-Wandplatten<\/b><\/strong>\u00a0und eine <strong><b>Maschine zur Herstellung von Betonfertigteilplatten<\/b><\/strong>, and combining the dual advantages of cast-in-place structure and precast components, this approach protects the stability and seismic performance of the foundation and load-bearing frame, while mechanized precast production substantially improves component output, saves materials and labor, and delivers the efficiency, energy savings, and environmental benefits of on-site assembly.<\/p>\n<p>Each construction stage has clear responsibilities and connects tightly to the next; by carefully managing site treatment, lime-soil compaction, cast-in-place columns and beams, mechanized component production, and lifting\/assembly, builders can improve the quality of precast concrete housing, reduce construction risk, shorten build time, and control cost.<\/p>\n<p>This construction process is well suited to low-rise residential construction needs, offers a clear and workable workflow, and aligns with the industry&#8217;s move toward green, industrialized building \u2014 providing a practical, standards-based technical reference for similar precast concrete housing projects.<\/p>\n<hr \/>\n<blockquote class=\"wp-embedded-content\" data-secret=\"or604GEgFN\"><p><a href=\"https:\/\/www.kelaiii.com\/de\/maschine-zur-herstellung-von-betonfertigteilzaunen\/\">China Betonfertigteil Zaun Wand Making Machine Hersteller | Kelai Machinery<\/a><\/p><\/blockquote>\n<p><iframe class=\"wp-embedded-content lazyload\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; visibility: hidden;\" title=\"\u300a China Precast Concrete Fence Wall Making Machine Manufacturer | Kelai Machinery \u300b\u2014Henan Kelai Industrial Co.,ltd.\" data-src=\"https:\/\/www.kelaiii.com\/precast-concrete-fence-wall-making-machine\/embed\/#?secret=5zI3VEJzrS#?secret=or604GEgFN\" data-secret=\"or604GEgFN\" width=\"500\" height=\"282\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" data-load-mode=\"1\"><\/iframe><\/p>","protected":false},"excerpt":{"rendered":"<p>Precast Concrete Wall Panel &amp; Floor Slab House Construction: A Complete Process Guide Abstract Precast concrete wall panels and floor slabs are the core components of assembled (prefabricated) concrete housing, offering the advantages of industrialized production, fast on-site assembly, energy efficiency, and strong structural stability. Compared with traditional fully cast-in-place buildings, houses built with precast [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":7953,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"default","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[1],"tags":[],"class_list":["post-7952","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/www.kelaiii.com\/de\/wp-json\/wp\/v2\/posts\/7952","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kelaiii.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.kelaiii.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.kelaiii.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.kelaiii.com\/de\/wp-json\/wp\/v2\/comments?post=7952"}],"version-history":[{"count":3,"href":"https:\/\/www.kelaiii.com\/de\/wp-json\/wp\/v2\/posts\/7952\/revisions"}],"predecessor-version":[{"id":7957,"href":"https:\/\/www.kelaiii.com\/de\/wp-json\/wp\/v2\/posts\/7952\/revisions\/7957"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kelaiii.com\/de\/wp-json\/wp\/v2\/media\/7953"}],"wp:attachment":[{"href":"https:\/\/www.kelaiii.com\/de\/wp-json\/wp\/v2\/media?parent=7952"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.kelaiii.com\/de\/wp-json\/wp\/v2\/categories?post=7952"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.kelaiii.com\/de\/wp-json\/wp\/v2\/tags?post=7952"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}